New Reactor Control Panel
The new reactor control panel was installed during the summer outage.
New fuel for VR-2 arrived
Today, the fuel for the new VR-2 subcritical assembly arrived from Finland.
The Fire Brigade Training
The fire brigade underwent special training in dosimetry and detector handling.